5.6 KiB
Roadmap: FanucProgramManager
Overview
Console tool for CNC program transfer and file management. Fanuc FOCAS base, expanding to multi-CN (Heidenhain LSV2, Siemens FTP, Mitsubishi FTP) with NC program validation.
Current Milestone
v0.1 Multi-CN Release (v0.1.0) Status: ✅ Complete Phases: 5 of 5 complete Completed: 2026-05-13
Phases
| Phase | Name | Plans | Status | Completed |
|---|---|---|---|---|
| 1 | cnc-abstraction | 1 | ✅ Complete | 2026-05-13 |
| 2 | heidenhain | 1 | ✅ Complete | 2026-05-13 |
| 3 | siemens | 1 | ✅ Complete | 2026-05-13 |
| 4 | program-wiring | 1 | ✅ Complete | 2026-05-13 |
| 5 | nc-validator | 1 | ✅ Complete | 2026-05-13 |
Phase Details
Phase 1: cnc-abstraction ✅
Goal: Fix namespace, add all Cnc/ files to csproj, complete ICncMachine + IFanucMachine with 3-file support Completed: 2026-05-13
Delivered:
- Namespace
Fanuc_integration.Cnc.*→FanucProgramManager.Cnc.*(29 files) IFocasDialectextended:UploadStart/DownloadStartacceptshort fileTypeIFanucMachineinterface: extendsICncMachinewith tool offset + work zero R/WCncManufacturerenum: Fanuc, Heidenhain, Siemens- All 29
Cnc/**/*.csfiles added to csproj
Phase 2: heidenhain ✅
Goal: Implement ICncMachine for Heidenhain TNC via LSV2 protocol Completed: 2026-05-13
Delivered:
HeidenhainConnectionConfig— IP, port 19000, credentials, timeoutLsv2Client— TCP framing, CRC-16/CCITT, login (SELECT+LOG_IN), ReceiveFile/SendFileHeidenhainMachine : ICncMachine— RunGuardedAsync pattern, state machine
Phase 3: siemens ✅
Goal: Implement ICncMachine for Siemens Sinumerik via FTP Completed: 2026-05-13
Delivered:
SiemensConnectionConfig— IP, port 21, creds, program dir/_N_MPF_DIR/SiemensFtpClient— FtpWebRequest wrapper, ASCII mode, passiveSiemensMachine : ICncMachine
Bonus (post-apply):
MitsubishiConnectionConfig/MitsubishiFtpClient/MitsubishiMachine : ICncMachineCncManufacturer.Mitsubishiadded to enum + factory + CLI
Phase 4: program-wiring ✅
Goal: Wire all manufacturers into Program.cs + InputArgs Completed: 2026-05-13
Delivered:
CncMachineFactory— creates rightICncMachinefromInputArgsInputArgs— addedmanufacturer,username,passwordfieldsProgram.cs— full rewrite usingICncMachinefactory; Fanuc 3-file viaIFanucMachinecast
Phase 5: nc-validator ✅
Goal: Per-manufacturer NC program validator runs inside WriteProgramAsync before upload Completed: 2026-05-13
Delivered:
ValidationSeverity/ValidationError/ValidationResultmodel typesINcProgramValidator+NcProgramValidatorwith universal + per-manufacturer rules- Validator injected into all 4 machine classes
NcProgramValidatorTests— 30+ NUnit tests
Next Milestone
v0.2 NcProgramManager ✅ Complete Status: Complete Phases: 4 of 4 complete Completed: 2026-05-17
| Phase | Name | Plans | Status | Completed |
|---|---|---|---|---|
| 06 | rename-cleanup | 1 | ✅ Complete | 2026-05-17 |
| 07 | license-core | 1 | ✅ Complete | 2026-05-17 |
| 08 | license-integration | 1 | ✅ Complete | 2026-05-17 |
| 09 | license-generator | 1 | ✅ Complete | 2026-05-17 |
Phase 06: rename-cleanup ✅
Goal: Rename FanucProgramManager → NcProgramManager (namespace, project files, test folder). Delete dead FANUCMachine.cs. Completed: 2026-05-17 Plans: [x] 06-01: Namespace + file rename
Phase 07: license-core ✅
Goal: IMachineFingerprint, ILicenseValidator, RSA signature verification, .lic file model
Completed: 2026-05-17
Plans: [x] 07-01: RSA core + interfaces + 6 unit tests
Phase 08: license-integration ✅
Goal: Wire license system into Program.cs, delete checkLicense, remove -chiave=, hardcode license.lic next to EXE
Completed: 2026-05-17
Plans: [x] 08-01: Program.cs wiring
Phase 09: license-generator ✅
Goal: Separate generator console app — reads machine fingerprint, signs, writes .lic file
Completed: 2026-05-17
Plans: [x] 09-01: LicenseGenerator standalone tool + real public key embedded
Standalone Phases (post-v0.2)
| Phase | Name | Plans | Status |
|---|---|---|---|
| 10 | readme-docs | 1 | ✅ Complete |
Phase 10: readme-docs ✅
Goal: Write Italian README for NcProgramManager and LicenseGenerator repos — describe what each does, prerequisites, setup, CLI usage, license workflow. Depends on: Phase 09 (license workflow complete) Plans: [x] 10-01: Italian READMEs for both repos
Milestone v0.3 — Code Quality ✅
Status: Complete Phases: 2 of 2 complete Completed: 2026-05-18
| Phase | Name | Plans | Status | Completed |
|---|---|---|---|---|
| 11 | refactor | 2 | ✅ Complete | 2026-05-18 |
| 12 | docs-cli | 1 | ✅ Complete | 2026-05-18 |
Phase 11: refactor ✅
Goal: Clean Architecture refactor of Program.cs — extract ArgParser, fix error handling in Scarica/Invia (try/finally, surface CncResult.Errors), remove AesCrypt dead code. Completed: 2026-05-18 Plans:
- 11-01: Extract ArgParser + clean Program.cs structure
- 11-02: Fix Scarica/Invia error handling
Phase 12: docs-cli ✅
Goal: Complete README parameter table — all 16 CLI args with descriptions; error codes with causa + soluzione. Completed: 2026-05-18 Plans:
- 12-01: README complete CLI reference + error codes table
Roadmap updated: 2026-05-18 — v0.3 complete.